Capability

Cloud

Elastic where it pays. Disciplined where it counts.

Landing zones, migrations and day-two operations across Google Cloud, AWS and Azure.

The brief

Cloud rewards architecture and punishes drift

A cloud account opened in a hurry becomes an expensive habit. Untagged resources, over-provisioned instances, three people with root and a bill nobody can explain line by line. We build the landing zone first — identity, network boundaries, tagging, guardrails and budget alerts — then move workloads into it in an order that keeps the risky ones last. The result is an environment where cost, access and blast radius are all deliberate choices.

Signals you may recognise

  • The monthly invoice climbs faster than usage, and nobody can attribute it to a team.
  • Production, staging and someone’s experiment share the same account and permissions.
  • A migration was started, then paused, and now half the estate lives in both places.

What we deliver

Cloud services in detail

Each item below is scoped, priced and delivered on its own — take one, or take the set.

Google Cloud

Project hierarchy, org policies, VPC design and GKE workloads built to Google’s well-architected patterns.

Amazon Web Services

Multi-account structures with Control Tower guardrails, so isolation between teams is enforced rather than agreed.

Microsoft Azure

Subscription and management-group design aligned to your Entra tenancy and existing licence entitlements.

Landing zone design

The foundation layer — identity, network segmentation, logging, key management and naming conventions, defined before workload one.

Migration & modernisation

Wave-planned moves with a documented rollback for each application, from straight rehosting to container re-platforming.

FinOps & cost governance

Showback by team, commitment and reservation strategy, anomaly alerting and quarterly right-sizing reviews.

Resilience & recovery

Backup policy, replication tiers and tested recovery objectives — a DR plan that has actually been rehearsed.

Hybrid & multi-cloud

Connectivity, identity federation and workload placement when part of the estate stays on your own floor.

What it produces

Outcomes we hold ourselves to

25% typical

Spend recovered

The usual first-quarter saving from right-sizing, scheduling and commitment cover.

100% tagged

Every rupee attributable

Cost split by team, product and environment — arguments about the bill end.

4waves

Migrations that finish

Applications grouped by dependency and risk so momentum never stalls halfway.

<1hr RTO*

Recovery you have tested

Objectives written down, rehearsed on a schedule and evidenced. *Target, workload-dependent.

How the work runs

Foundation first, workloads second

Moving applications into an unfinished landing zone is the single most common reason cloud programmes overrun. We invert the order.

Discover

Inventory and dependency map

Every application, its data gravity, its integrations and the business tolerance for it being unavailable.

Found

Build the landing zone

Accounts, identity, network, policy guardrails, logging and cost tagging stood up and validated before anything moves.

Move

Migrate in waves

Low-risk workloads prove the pattern, complex ones follow. Each wave has a cutover plan and a way back.

Tune

Operate and optimise

Monthly cost and performance review, commitment adjustments, and guardrail updates as the estate matures.

Deliverables

What lands on your side

  • Landing-zone architecture document and policy set
  • Application dependency map with migration wave plan
  • Tagging standard and cost-allocation dashboard
  • Backup, replication and tested recovery runbook
  • Infrastructure-as-code repository you own outright

Platforms and tooling

What this is built on

Google CloudAWSMicrosoft AzureTerraformKubernetesDockerCloudflareVeeam

When clients call us

Situations this work is built for

Scenario

First move off your own servers

A hardware refresh is due and the maths favours renting capacity. We plan the exit so the lease ends and nothing is stranded.

Scenario

A bill that has quietly doubled

A cost forensics engagement that finds the drift, fixes it, and puts guardrails in so it does not return.

Scenario

Scaling for a product launch

Autoscaling, load testing and a cost ceiling agreed before traffic arrives, not discovered after it does.

The difference

Why our cloud work holds up

We are certified on all three hyperscalers, which means the recommendation follows the workload.

No platform loyalty

We carry no resale target that pushes you toward one provider. Sometimes the honest answer is that your workload should stay where it is.

Cost is a design input

Unit economics get modelled during architecture, not discovered on the first invoice. You approve a number before we build to it.

You keep the code

Everything is delivered as Terraform in your repository. Nothing about your environment lives only in our heads.

Questions

Answered before you ask

It depends on where your data already sits, what your team can support, and your licensing position. We run a short workload-fit assessment and give you the comparison with the reasoning, rather than a conclusion.

Most workloads move with a short, scheduled cutover and several rehearsals beforehand. Anything that genuinely cannot pause gets a replication-and-switch approach so downtime is measured in minutes.

Usually a meaningful amount, yes. Scheduling non-production, right-sizing over-provisioned instances and buying appropriate commitments are the fastest wins and require no application changes.

No, and you often should not. Latency-sensitive, licence-locked or heavily regulated workloads frequently belong on your own infrastructure. We design for the split rather than pretending it does not exist.

Talk to us

Send us last month’s invoice

A single billing export tells us more than a discovery workshop. We will come back with where the spend is going and what we would change first.

info@karpexa.com+91 96067 51633Replying within 1 business day